Fleet Size & Cost
100% uptime for 100% of your fleet allows achieving the same throughput with much less robots in your fleet
Work:Charge Ratio
Work:Charge Ratio defines critical parameters like extra robots in fleet or amount of needed chargers
Nominal Working Time
hours
E.g. depleting from 80% battery to 30%
Charging Time
hours
E.g. topping off from 30% to 80%
Work:Charge Ratio
6:1
Fleet Uptime
How much of your energy consumption is being delivered by CaPow
Fleet Uptime
%
CaPowered Work:Charge Ratio
∞
Required Fleet Size
units
Cost per robot
$
Nominal Number of Chargers
units
Fleet Size ÷ Work:Charge Ratio
Cost per charger
$
They're not so cheap, aren't they?
Fleet Size
Affected by charging downtime
12
CaPowered Potential Fleet Size
Reduced fleet, increased efficiency
10
Number of Required Chargers
CaPowered Fleet ÷ CaPowered Ratio
0
CaPow Fleet Savings
Saved robots and chargers × cost
$110,000
Floor Space Savings
Value of space freed up by removing floor chargers
Real-estate per charger
ft²
How many ft² does a charger occupy
Cost of ft²
$/ft²
How much does it cost to "lose" one ft²
Number of Chargers Saved
units
Nominal number of chargers - required chargers
CaPow Space Savings
ft² per charger × cost of ft² × chargers saved
$0
Battery Implications
100% uptime allows your robots to use much smaller batteries, for much longer duration
Current Battery Capacity
Wh
Battery Price
$
Current Battery Lifecycle
years
Reduced Spec Battery Capacity
Wh
100% uptime allows smaller battery capacity
Spec Down Battery Price
$
Smaller batteries cost less
Improved Battery Lifecycle
years
Smaller DoD allows x2 battery lifecycle
Solution Lifespan
years
Automation solution duration, in years
CaPow Energy Savings
Traditional - CaPowered
Cost of Batteries- Traditional
Fleet size × battery price × number of batteries
$72,000
Cost of Batteries- CaPowered
CaPowered Fleet size × reduced battery price × number of batteries
$30,000
Net Battery Savings
$42,000
More robots in fleet, more batteries
CaPow Overall Improvement
How much money did CaPowering your fleet actually gain you?
CaPow Fleet Savings
$110,000
CaPow Space Savings
$0
CaPow Battery Savings
$42,000
CaPow Overall Improvement over 5 years
$152,000
CaPow Solution Pricing
So how much does it cost?
CaPow Overall Cost Duration
Mirrors Solution Lifespan years
Mirrors Solution Lifespan years
Genesis Price
100% uptime price, one time fee, per robot $
100% uptime price, one time fee, per robot $
Genesis Energy Management Service cost
energy monitoring fee, annual, per unit $
energy monitoring fee, annual, per unit $
CaPow Overall Cost
(Genesis Price + Genesis EMS × 5 years) × CaPowered Fleet Size
$152,030
Bottom Line
Total project cost comparison over 5 years
Overall Project Cost Traditional
$682,000
Overall Project Cost CaPowered
$682,030
Net CaPow Savings
0%
ROI ⓘ
Day 1
Hover for full calculation